Budgets March 2026 7 min read

What a Hobart renovation really
costs in 2026

We opened the books on six recent projects to show where renovation money actually goes, including the line items nobody puts in the brochure.

Tom Okafor reviewing project budgets at the studio
Tom Okafor
Project manager
Renovation budget spreadsheet with material samples and receipts on a workbench

The honest averages

Across our last six Hobart projects, the build costs landed here: bathrooms between $28,000 and $42,000, kitchens between $45,000 and $70,000, and full-home cosmetic renovations between $1,100 and $1,600 per square metre. Those are real invoiced figures, not wishful thinking from a renovation show.

The range is wide because the house decides a lot of it. A weatherboard in West Hobart hides different surprises than a 1970s brick place in Howrah.

Where the money actually goes

On a typical kitchen project the split looks roughly like this:

  • Cabinetry and joinery: 30 to 35 percent
  • Benchtops and splashbacks: 12 to 15 percent
  • Trades (plumber, sparky, tiler, plasterer): 25 to 30 percent
  • Appliances and fixtures: 15 to 20 percent
  • Contingency, the part everyone wants to skip: 10 percent

The single most common budget blowout we see is clients comparing a quote without contingency against one with it. The cheaper quote is not cheaper. It is just unfinished.

The cheaper quote is not cheaper. It is just unfinished.

The costs that surprise people

Asbestos removal in pre-1990s homes runs $3,000 to $8,000 and you do not get a choice about it. Re-wiring during a kitchen job adds $4,000 to $9,000 if the board is old. Floor levelling under new tiles, $80 to $140 per square metre, shows up on about half our bathroom jobs.

None of this is us being pessimistic. It is us pricing the house we found instead of the house in the photos.

How to keep a budget from drifting

Three habits keep projects honest. First, decide everything before demolition: every tap, tile and handle, because mid-build decisions cost double. Second, hold the 10 percent contingency and treat it as spent only when the invoice arrives. Third, put every change on paper with a price before anyone lifts a tool.

Our full-service design projects run on exactly this system, which is why our Friday cost reports are usually boring reading.

Working on a project?

Want a real number for your place?

A $220 consult gets you a walkthrough and an honest read on what your renovation would cost.

Book a consult
Material price tags and supplier quotes spread across a desk
In short

If you only
remember this

Notes and sketches for the article spread on a desk
  • Bathrooms run $28k to $42k and kitchens $45k to $70k on real Hobart invoices
  • Joinery and trades eat two-thirds of a kitchen budget, not appliances
  • Always compare quotes that include contingency, not stripped ones
  • Decide every fitting before demolition starts, mid-build choices cost double
Tom Okafor reviewing project budgets at the studio
Written by

Tom Okafor

Tom runs the numbers and the calendars on every Smart Interiors Lab project. He has personally tracked about 140 sets of invoices, so when he says a bathroom costs X, it costs X.

Asbestos sheeting being removed from a 1960s laundry
Rewired switchboard during a kitchen renovation
Fresh floor levelling compound before tiling
From reading to doing

Ready for a quote
with real numbers?

We quote line by line so you can see exactly where every dollar goes before you commit to anything.